Idea 5 — Pit and lava-tube access planner
15 November 2026. One of six ideas; read 00-overview.md
first. Source numbers refer to its section 8. Compiled with AI (Claude);
not re-checked by a person. "Judgement" marks an assessment.
Conflict to flag: this idea is not at the South Pole. It is outside
decision D12 and outside the focus in D17. It is listed because it is
the only idea that matches the research field stated for Martin Ivanov
in CLAUDE.md section 4. That match is unconfirmed until his
CV is on file.
Product in one line
For one lunar pit, the tool returns a 3D model of the rim, walls and visible floor with uncertainty, the light and temperature inside over a lunar day, and an access analysis: descent lines, anchor positions on the rim, and LoS for communications from the floor.
Decision it supports
A mission team decides where to place a lander, a rover or a crane near a pit, when the floor is lit, and what a descending robot must survive.
Why now
- NASA selected GIMLI on 30 September 2026 to survey the ground around the Marius Hills pit and test for a lava tube [2]. No launch date or lander is named; the Norwegian Space Agency supplies the ground-penetrating radar (news) [35].
- Radar data indicate a cave conduit tens of metres long below the Mare Tranquillitatis pit [33].
- Shadowed parts of that pit stay near 17 °C according to a model fitted to Diviner data [34].
- LunarLeaper is a European mission concept for a legged robot that surveys the subsurface near the Marius Hills pit [36]. Its ESA status was not checked.
What exists
- Science results on single pits: a thermal model of the Mare Tranquillitatis pit, fitted to Diviner data [34]; radar modelling of the conduit [33].
- A planning tool for pit access: not found (one search). ESA studies on lunar caves were not searched; check before any use.
Data basis and checks
- Images: LROC NAC images of the pits at several Sun angles and view angles. The number per pit was not counted.
- Temperature: the pit fills about 20% of one Diviner pixel [40]. A temperature check is coarse.
- The interior beyond the visible floor is unobserved. Any output there is inferred or synthetic.
Type A slice (TRL 3)
| CF | Function | Check |
|---|---|---|
| CF1 | 3D model of rim, walls and visible floor from multi-angle images, with uncertainty | Predicted shadow edges against NAC images that were held out |
| CF2 | Light and temperature inside the pit over a lunar day | Light: held-out images. Temperature: the Diviner pixel, coarse |
| CF3 | Access analysis: descent lines, rim anchor positions, LoS from floor to rim and to Earth | Geometric consistency only; no measured check exists |
Out of the Type A slice: the tube interior, structural stability of the rim, habitat layout, other pits.
Users outside ESA (candidates; none contacted)
- The GIMLI team (Planetary Science Institute) and its partners, the Norwegian Space Agency among them.
- The LunarLeaper team.
- Japanese groups in lava-tube research [TBD: names and projects from Martin's CV].
Four tests (judgement)
- Unique: pass. No planning tool found.
- Feasible: weak. One critical function has no measured check, and image coverage per pit is not yet counted.
- Needed: weak. Two mission concepts, one selected, none with a date.
- Fits Type A: pass in form. It fails the fixed South Pole focus.
Link to ESA programmes and path beyond TRL 3
Not established. ESA's stated long-term interest in a nearside location with Earth visibility (C finding 6) is a possible link; lunar caves in ESA plans were not checked.
Risks and unknowns
- Requires a decision by Ivaylo to reopen D12.
- The market is small and late compared with ideas 1 to 4.
- Martin's exact role, projects and affiliation in lava-tube research are [TBD]. Do not present this fit to ESA before the CV confirms it.