Topic D — Available technology
Follow research-brief.md for the output format and
rules. Save the result as
research/findings/D-technology.md.
- Feeds: 1.4.2 Technical Steps; 1.4.4 Implementation aspects (trade-offs); 1.7 Technical Programme of Work; 1.9 Facilities; Part 3 costs.
- Find: for each capability SELIS needs, the existing
open-source or commercial components, their licence, maturity and
limits, and what must be built new. Use the pipeline in
CLAUDE.mdas the starting point, not as the answer: for each capability, also look for alternative approaches and say whether one is better suited to a TRL 3 proof of concept. - Cover: terrain generation (stereo and other reconstruction routes), geometry and illumination modelling, AI reconstruction methods, 3D engines and simulation frameworks, and data delivery formats.
- Cost limits from the call: procurement of infrastructure and generic hardware or software tools is not eligible. Cloud processing for the activity's data is eligible in principle. Flag any component that would need to be bought or licensed, with its price if published.
- Table columns: capability, baseline component, alternative considered, licence, maturity, known limits, reuse or build, effort risk (low, medium, high).
- Answer: what is reused, what is new development, where the schedule risk sits, and where an alternative should replace the baseline.