What v2 proposes, limited to the points that affect a criterion. The criterion in brackets is assigned by this file, with the logic of v1.

Concept. Mission-planning software for early robotic missions at the lunar South Pole, on sites modelled from public mission data. The name SELIS is kept for now. The framing is long-duration surface missions. v2 uses no "digital twin", no "first" and no permanent base.

Stated objective and maturity. Type A scope is power analysis only: illumination, darkness and energy yield for solar assets 1 to 5 m above the surface, at one site. Start TRL, end TRL, price, duration and work packages: [TBD]. (C1, C2, C3)

Main features

Feature What v2 proposes Affects
Published terrain NASA 5 m LOLA site DEMs with 100 clones. JAXA 1 m and other finer published terrain compared with the LOLA baseline and tagged as inferred. No own DEM production. C1
Site Connecting Ridge; fallback Malapert Massif. C1, C2
Illumination and darkness with a stated confidence The published NASA method (Barker et al. 2021) on the 100 clones. C1, C2
Check against measured data A test of whether the stated confidence holds against dated orbital (LROC NAC) images. C1
Height sweep A sweep over heights around a user-set height, within 1 to 5 m. C1, C2
Energy yield Yield for solar assets. Panel-model depth [TBD] until the interview with the Lithuanian company. C1, C2
Slope constraint Published NASA slope maps, reused as a placement constraint. C1
Data-class tagging Measured: recorded by an instrument at that place. Inferred: estimated where no instrument measured. Derived: computed by a published physical or geometric model, recording the classes of its inputs. Synthetic: not used in Type A. C1, C2
Machine learning None in Type A; no AI specialist. C1, C3
Next phase (out) Landing-site assessment, Earth visibility, a 3D viewer. C2

Uniqueness claim. Luminous applies a published NASA method, tests whether its stated confidence holds against dated orbital images, and delivers the result to a planning user. No "new method" claim. (C1, C2)

Users and market. First: European solar power developers, with one lead (a Lithuanian micro company, name [TBD], requirements not validated). Second: private lunar mission companies. Path beyond TRL 3: Argonaut Mission 1, MAGPIE and LUVMI-M. Revenue figures: [TBD]. (C2)

1. Marks

Criterion Weight Mark (range, J) Weighted (range × weight)
C1 Technical quality and team 40% 55–68 22.0–27.2
C2 Prospects, programmatic fit, maturity 30% 48–62 14.4–18.6
C3 Management, cost, planning 25% 55–68 13.75–17.0
C4 Administrative, contract, IPR 5% 75–90 3.75–4.5
Overall 54–67

2. C1 — Technical quality and team (55–68)

Weaknesses, most damaging first. W3 to W6 are placed here by the reviewer; W7 and the last bullet by this file.

  1. W3. The team shows no domain experience. The CV on file shows cloud and platform engineering; Martin's CV is pending and his field is lava-tube habitats. Illumination modelling, image registration and photovoltaic skills are not evidenced (compliance row C9).
  2. W4. It risks reading as a NASA re-run on ESA's own 2012 site. Barker ran 100 clones at Connecting Ridge at 1 m and 5 m, so that function is an input, not a critical function (type-a-activities.md section 7). Only the calibration against images is clearly new, and the note asks for two to four critical functions.
  3. W5. The calibration test may not be feasible, and it tests the wrong height (J). Orbital images show the lit state of the surface, not of a point 1 to 5 m above it. Usable lit or shadowed states per cell are uncounted, and the registration error (about 5 m RMS) equals the grid size (B2 section 7).
  4. W6. Method error may exceed terrain error (J). Two 2012 tools differed by about 44.7 days RMS in longest lit period at Connecting Ridge, because of the horizon calculation. Luminous must re-implement the engine; a confidence built from clones alone omits this error (A3 findings 3 and 4).
  5. W7. Start TRL evidence weakens. Without own DEM production the Ames Stereo Pipeline work is irrelevant. Only the Grasshopper photovoltaic demos relate: TRL 1 is evidenced, 2 is arguable only if the demo is documented (J; compliance row K2).
  6. Other gaps. The name SELIS no longer fits. glossary.md conflicts with the new class definitions and with the new use of "confidence". PGDA pages carry no licence text (compliance row K6).

Strengths:

3. C2 — Prospects, programmatic fit and maturity (48–62)

Weaknesses, most damaging first. All three are placed here by the reviewer.

  1. W1. The lead user and the value do not match. The clone effect is large at 1 m and "almost negligible" at 5 m (A3 finding 2). Published power designs use towers of 10 m or more; assets near 2 m are lander and rover arrays, which v2 ranks second. The customer's panel height is unknown.
  2. W2. No evidenced demand. One unnamed lead, no interview, no letter. No user was found who says free tools are insufficient or who would pay (C finding 10); NASA offers on-request illumination at a chosen height (compliance rows I5 and K8).
  3. W8. The path beyond TRL 3 is asserted. No Argonaut or MAGPIE site was found, and none of those teams was contacted. Benefit to Bulgaria is unargued.

Strengths:

4. C3 — Management, organisation, cost and planning (55–68)

No price, hours, schedule or work packages exist, so the reviewer lists risks, not weaknesses:

  1. Price. A price at the ceiling would look padded (playbook section 6). Build it from the work.
  2. Compute cost is unknown. Barker used a NASA computing centre (A3 unknowns).
  3. Substance (J). Enough for about 9 to 12 months for two people only with the engine re-implementation, a cross-check against Barker's table, the calibration, the error sources outside the clones and the yield model. Thin if it is only a clone re-run.

Strength:

5. C4 — Administrative, contract and IPR compliance (75–90)

No weakness listed. The range assumes full compliance and is the same for any shape of the idea. Open compliance rows named by the reviewer: K2, K4, K6 and C9.

6. Likely negotiation questions

Not produced in this evaluation.

7. Top fixes, by expected gain in the weighted mark

The reviewer gave three:

  1. User and height. Interview the Lithuanian company and get a signed letter with asset height and needed quantities; seek a second letter from a lander or rover user. Re-centre on lander and rover arrays if the height is 5 m or more.
  2. Critical functions. Define two to four with pass or fail numbers; state how a surface check transfers to 1 to 5 m; count the usable lit and shadowed states in the 322 images.
  3. Evidence for start TRL and team. Document the photovoltaic demo; run one nominal case against one NAC image and Barker's table; add Martin's CV and roles.

Necessary before submission:

8. Comparing later evaluations

Save each later evaluation in eval/ with the same headings and the same marks table. Compare the four criterion marks and the overall mark first, then check which weaknesses are closed, which remain and which are new. Sections 9 to 13 do this for v1 and v2.

9. v1 to v2 at a glance

Criterion v1 draft v2 idea (J) Comparable
C1 Technical quality and team 45 55–68 In part
C2 Prospects, programmatic fit, maturity 35 48–62 In part
C3 Management, cost, planning 52 55–68 No
C4 Administrative, contract, IPR 40 75–90 No
Overall 43.5 54–67 Not like for like

10. The most important changes

Change from v1 to v2 Effect Criterion Reason
Scope: nine features cut to power analysis at one site Improves C1, C3 One use case end to end; scope in proportion to the budget
VR/AR, robotics simulation, printed model, vision model and terrestrial example dropped; 3D viewer moved to the next phase Improves C2, C1 No overlap with ADTLAS; no AI or 3D skills needed
End point: installable integrated prototype with user trials becomes a proof of concept of critical functions Improves C1 Fits TRL 3 if "delivers to a user" means a customer review
Claim: "integration in one environment" becomes an applied NASA method with its confidence tested Mixed C1, C2 Honest and sourced; easier to dismiss as "NASA already did this" (W4)
Terrain: own multi-DEM site becomes published terrain at Connecting Ridge Mixed C1 Data exists at the site; the stereo DEM work stops being start-TRL evidence (W7)
New: test of the confidence against dated orbital images Mixed C1 The only clearly new element; may be infeasible (W5, W6)
New: assets at 1 to 5 m, with power developers ranked first Degrades C2 The method matters at 1 m, not at 5 m; the lead's height is unknown (W1)
Users: a 30-organisation survey becomes one lead and two ranked segments Mixed C2 A lead exists; no letter, and the market is narrower (W2)
Missions: none named becomes Argonaut Mission 1, MAGPIE, LUVMI-M Mixed C2 Stronger mission link; the path is asserted (W8)
Four data classes: a passing mention becomes a defined tagging rule Mixed C1, C2 All four are defined; they are "background and not the claim"

11. What improves, what degrades, what is unchanged

v2 improves:

v2 degrades, or adds as a new risk:

Unchanged, or not assessable until a draft exists:

12. Open items

Both were proposed after the review. Proposed, not confirmed; effect on marks not evaluated.

13. Notes on references