- SELIS: Site Environment & Landing Infrastructure Simulator. The product and the project.
- Digital twin: the registered, time-aware 3D model of a lunar site that SELIS produces. Do not alternate with "simulator", "platform" or "sandbox" for the same thing.
- Site package: the deliverable data set for one lunar site (terrain, derived layers, provenance and confidence, metadata).
- Measured: data taken directly from mission observations.
- Derived: data computed from measured data (slope, roughness, illumination, visibility).
- Inferred: output of AI or reconstruction methods that fills gaps or adds detail. Always tagged.
- Synthetic: procedurally generated sub-resolution detail for simulation. Never ground truth.
- Provenance: the record of which sources and processing steps produced a value.
- Confidence: the stated reliability of a value, per cell.
Programme and proposal terms
- PECS: Plan for European Cooperating States
- RFI: Request for Information
- TRL: technology readiness level
- Type A: Research and Preparatory Activities under the PECS call; start TRL at least 1, end TRL at most 3.
- Prime: the entity that signs the contract with ESA. Here, Luminous Ltd.
- esa-star: ESA's supplier registration and tendering system.
- PSS forms: ESA's standard cost forms, issue 5. PSS A1: company cost rates and overheads. PSS A2: company price breakdown, with Exhibit A (other cost elements) and Exhibit B (travel and subsistence). PSS A8: manpower and price summary per work package.
- CfP: Call for Proposals
- KAF: Key Acceptance Factor. A declaration that must be true for the tender to be admitted.
- TEB: Tender Evaluation Board. The ESA experts who mark the proposal.
- WBS / WP / WPD: work breakdown structure / work package / work package description
- TDP, ES, FR, FP, CCD: mandatory deliverables: Technical Data Package, Executive Summary, Final Report, Final Presentation, Contract Closure Documentation
- Background IP / foreground IP: intellectual property that exists before the contract and is used in it / intellectual property created by the funded work
- End customer: an organisation that would use the result and helps define the requirements
Technical terms
- DEM: digital elevation model
- LRO / LROC NAC / LOLA / Diviner: NASA Lunar Reconnaissance Orbiter and its narrow-angle camera, laser altimeter and thermal radiometer
- Kaguya (SELENE) TC: JAXA lunar orbiter and its Terrain Camera
- SPICE: NASA/NAIF geometry and ephemeris system
- ISIS / ASP: USGS image processing system / NASA Ames Stereo Pipeline
- PDS4: NASA Planetary Data System archive standard
- COG: cloud-optimised GeoTIFF
- PV: photovoltaic